Scarborough Law Courts

 

 

In September 2004 Scarborough Law Courts closed down for refurbishment. Temporary Law Courts were provided across the street. The Law Courts were closed for 68 weeks during which time the building was totally refurbished.

 
Subcontracted through Wrights Construction,
H Pickup provided Mechanical and Electrical Services.
 
The Heating Installation compromised of providing 67 new and repositioned radiators throughout the building. Heating Mains were also routed to the roof to supply Air Handling Units.
 
Upgraded Gas supplies were installed to each boiler along with new Flues.
 
Existing Ductwork Systems were stripped out and a complete new system was installed by
S & P Darwells. Works included a new ducted Ventilation and Air Conditioning System, Twin System Condensers and a new Air Handling Unit.
 
Domestic Cold Water systems were installed and point of use Electric Water Heaters served Hot Water Outlets.
 
Andover Controls modified an existing Control Panel to suit the new M & E Installation.
 
Electrical Services include: Complete Mains Distribution, Lighting Installation and Small Power to the whole building.
 
Small Power was also installed to all Specialist Services, Mechanical Services and Controls
 
A complete Fire Alarm System, Disabled Alarm System and FM TV System were included in the project.
 
Specialist Subcontractors were employed to install the following, works were overseen by
H Pickup:
  • Security Alarms
  • C.C.T.V.
  • Door Access Systems
  • Video Links
  • Cell Call Systems
  • Lightning Protection
  • Data Systems
Testing and Commissioning were carried out by us on both the Mechanical and Electrical Services.

 