Mechanical
Services to serve a New Classroom Extension:
Works started with the
removal of redundant LPHW radiators and associated pipework. Alterations
were made to the LPHW system to suit the New Classroom Extension.
Multibeton Underfloor
Heating was laid to serve the New Extension, this included supplying a
new controls system and installing a new LPHW circuit. Underground
Heating Mains were installed to serve the new Heating Manifolds and
Radiator System.
The domestic Cold
Water service was extended and electric Hot Water Heaters were installed
to serve the New Extension and adjacent areas.
Heat recovery,
ventilation units and controls were also installed.
The Domestic Water
Services System was Chlorinated. Testing and Commissioning was carried
out by our own engineers.
Operating and
Maintenance Manuals and As Fitted Drawings were supplied to the Client
upon completion of the job.
|
|