Completed by the end of 2004,
H Pickup was responsible for upgrading the main boiler plant, and various
other boilers within the hospital grounds.
The bulk of the work
consisted of replacing the existing solid fuel boiler plant with new dual
fuel boilers, in another location. New gas and oil supply's were routed
to the new plant room, and a bunded oil tank sited in an outdoor
compound.
New boilers were also
installed in the Ambulance Station, which also required a new gas supply.
And 9 individual residential units.
New BMS (Building
Management System) control panel was installed to serve the new plant
rooms.
Existing connections to the
redundant boiler plant were re-routed to the new boiler plant. These
connections were done in one single operation with downtime to the
heating system being at an absolute minimum.
Various subcontractors
including GBH who were employed to install a new 250 Dia. gas main.
Andover Controls were responsible for installing the BMS control panel.
|